City · New Jersey
ADU rules in Avon-by-the-Sea
These are the primary sources for accessory dwelling unit regulations in Avon-by-the-Sea: the city's own zoning code, planning department pages, and permit guides. Start here before talking to anyone: the rules below are what your permit reviewer will apply.
Rules at a glance
Avon-by-the-Sea allows no market-rate backyard ADU. The only permission is § 113-11D, a conditional use in the R Single-Family Residential District (which covers almost the entire borough) for 'Accessory apartments for low and moderate income households in single family homes and accessory buildings': one per lot, on a lot meeting the zone's 7,000-square-foot, 50 by 100 foot minimums, with the owner living on the property year-round and the unit rented only to an income-qualified household under a deed restriction. § 113-5C deems detached garages, sheds, garage apartments and cottages/bungalows accessory buildings, but the R district permits only one detached garage (26 by 26 feet, two cars plus storage) and one 100-square-foot shed as new accessory buildings, bars bathrooms and kitchens in a detached garage (§ 113-11C(8)) and living space on the first floor of any garage (§ 113-20F), so the workable detached route is converting an existing garage apartment or cottage, and a new detached unit would need relief beyond the conditional use. Garage apartments and cottages appear in the code only as 'preexisting nonconforming' uses with renovation guidelines (§ 113-11C(11) and (12)); a new market-rate one is an unlisted use (§§ 113-3, 113-10K, 113-23) that needs a d(1) use variance; when the Society of Mount Carmel sought a new garage apartment at 23 Norwood Avenue, the board chair 'Did not see enough justification for the creation of a new rear dwelling' (11-24-2025 minutes; carried and not heard since).
Land Development §§ 113-11D(1) to (12) (Ord. No. 1-2006), 113-11B(2) and (3), 113-11C(8), (11) and (12) (as amended by Ord. Nos. 6-2011, 3-2012 and 2-2020), 113-20F (Ord. No. 14-2020), 113-5C (Accessory building, structure or use; Cottage/bungalow; Garage apartment), 113-3, 113-10K, 113-23; Planning Board minutes 11-24-2025 (23 Norwood Avenue)A second unit inside or added onto a house is possible only as the same § 113-11D conditional use: an accessory apartment for a low- or moderate-income household 'in single family homes', occupying no more than 35 percent of the house's total square footage, with at least two rooms besides bathrooms and direct outside access through an egress door that does not alter the character of the facade. The tenant must meet the regional income limits, the rent must be affordable to a household earning no more than 57.5 percent of median income, and affordability controls of at least 30 years must be recorded (§ 113-11D(8) to (10)). Otherwise the R district permits only a 'Single-family detached dwelling unit' (§ 113-11A(1)), no zone lists two-family dwellings, and uses not specifically permitted are prohibited (§ 113-10K), so a market-rate in-law suite with its own kitchen needs a use variance.
Land Development §§ 113-11A(1), 113-11D(5) to (10), 113-10K, 113-3; § 113-5C (Accessory apartment for low and moderate income households)§ 113-11D(6) caps the unit at 35 percent of 'the total square footage of the applicant's house' (about 840 square feet for a 2,400-square-foot house), § 113-11D(7) sets a floor of two rooms excluding bathrooms, and § 113-11D(2) and (3) require the lot to meet the R district's 7,000-square-foot area, 50-foot width and 100-foot depth (§ 113-11C(1)) and the apartment to meet the zone's yards. Detached accessory buildings follow the R district rules: one garage of no more than 26 feet in width and depth (§ 113-11B(2)), at most 18 feet tall (§ 113-11C(4)(b)), at least 25 feet from the house (§ 113-17B), outside the front yard and 6 feet from the rear lot line (§ 113-11C(6)). The renovation guidelines for preexisting nonconforming garage apartments cap the building at 26 feet with pitched roofs, no dormers, living area on the second floor only and no outdoor stairs (§ 113-11C(11)), and cottages and bungalows keep living area on the first floor only, with Planning Board site plan approval before renovation or reconstruction (§ 113-11C(12)). Building coverage on lots over 5,000 square feet is 31 percent with a detached garage (house at most 26 percent), or 29 percent when the detached garage is a garage apartment (house at most 23 percent), with at least 50 percent of the lot pervious (§ 113-11C(3)).
Land Development §§ 113-11D(2), (3), (6) and (7); 113-11B(2); 113-11C(1), (3), (4)(b), (6), (11) and (12); 113-17BThe first condition of the § 113-11D conditional use is that 'The owner of the lot resides on a year-round basis on the property in question', and approval is conditioned on the owner submitting 'an affidavit of continuing use every two (2) years' (§ 113-11D(1) and (11)), so the requirement applies at application and continues for as long as the apartment exists. Neither § 114-6C nor the 2026 Accessory Apartment Manual adds a separate occupancy rule. Legacy nonconforming garage apartments and cottages carry none: at the 4-28-2025 hearing on a rear cottage at 314 Norwood Avenue the applicant's attorney objected to a neighbor's request for a deed restriction against renting it, and the 5-27-2025 approval's stipulations include no rental limit. New Jersey has no ADU statute, so nothing preempts the local rule.
Land Development § 113-11D(1) and (11); Planning Board minutes 4-28-2025 and 5-27-2025 (Queli, 314 Norwood Avenue)§ 113-21B(1) (added by Ord. No. 3-2020) reads 'Residential dwelling units - residential developments: as per N.J. Residential Site Improvement Standards. All residential lots in the Single-Family Residential District shall contain a minimum of two off-street parking spaces per residential unit.' Required spaces must be on the same lot, parking in front yards is prohibited, each space is at least 9 by 18 feet, and a lot that abuts a lane takes its driveway from the lane only (§§ 113-21A(2)(c) and A(3), 113-5C Parking space). The Planning Board applies the count to garage apartments: for 112 Garfield Avenue (a rebuilt house plus a nonconforming garage apartment) the applicant's engineer testified that 4 stalls are required, 3 exist and 3 are proposed, and the board approved the use variance 7-0 on 3-23-2026. Under the state RSIS, Table 4.4 is 'the maximum number of parking spaces planning boards and other local reviewers shall require' (N.J.A.C. 5:21-4.14(c)) and the rules are 'the maximum that may be required in connection with residential development' (5:21-1.5(b)); the table has no accessory-unit category (a one-bedroom garden apartment is 1.8 spaces), so the local two-space minimum can exceed the state ceiling for a small unit.
Land Development § 113-21A(2)(c), A(3) and B(1) (Ord. No. 3-2020); § 113-5C (Parking space); N.J.A.C. 5:21-1.5(b), 5:21-4.14(c) and Table 4.4; Planning Board minutes 2-26-2026 and 3-23-2026 (Crighton, 112 Garfield Avenue)An accessory apartment is a conditional use, so it needs Planning Board approval after a noticed public hearing: § 113-29A requires application to the Planning Board before a construction permit or certificate of occupancy issues, the board decides the conditional use together with site plan review within the 95-day period, and § 113-33C(1) and D(1)(a) require a hearing with notice to owners within 200 feet ($300 conditional use fee, § 113-47B(5)). The nine-member Planning Board holds the Zoning Board of Adjustment's powers (§ 113-30), with the mayor and the governing-body member sitting out d-variance relief. The borough's program process (Accessory Apartment Manual, Res. No. 72-2026, filed with the court on 3-11-2026) adds an application to the Municipal Housing Liaison, a building inspection, design approval, a subsidy contract, a recorded deed restriction and a final certificate of occupancy before the first certified tenant moves in. A market-rate garage apartment, cottage or in-law unit, or the enlargement of an existing nonconforming one (§ 113-20D), needs a use variance under N.J.S.A. 40:55D-70(d) from the same board, which approved such variances for 314 Norwood Avenue (5-27-2025), 112 Garfield Avenue (3-23-2026) and 424 Garfield Avenue (6-22-2026), all for existing rear dwellings.
Land Development §§ 113-11D, 113-29A(1) to (4), 113-30, 113-33C(1) and D(1)(a), 113-47B(5), 113-20D; § 113-5C (Planning Board); Res. No. 72-2026 (Accessory Apartment Manual, adopted 3-9-2026); N.J.S.A. 40:55D-70(d)§ 113-11D(8) to (11) require the occupant to meet the regional income limits, a rent affordable to a household earning no more than 57.5 percent of median, affordability controls of at least 30 years by deed restriction, and the owner's affidavit of continuing use every two years. Ord. No. 3-2026 sets the program floor at 10 years ('for at least 10 years thereafter, the accessory apartment shall be rented only to income eligible households', § 114-6C(3)), and the March 2026 manual restricts units 'for a period of no less than 10 years', sets maximum rents at 60 percent of median for moderate-income and 45 percent for low-income units, and pays a creation subsidy of $30,000 (very low), $25,000 (low) or $20,000 (moderate) per unit for a planned 10 units; a 30-year restriction satisfies both texts. Chapter 134 (Ord. No. 07-2022) requires a rental certificate of occupancy for every rental unit, applied for within six days of signing a lease and inspected within 15 days ($50 annual, $75 seasonal, $400 for summer weekly rentals of 7 to 15 days, $100 monthly), bans compensation for 'a period of six (6) days or less' (§ 134-10A), allows stays under 7 days only in licensed hotels or rooming houses (§ 134-4F), prohibits renting 'only part of a unit' (§ 134-1), and requires annual landlord registration by April 15 (§§ 134-13, 134-16). Chapter 116 adds an annual $50 filing of a certificate of $500,000 liability insurance ($300,000 for an owner-occupied home of four or fewer units), and § 113-10P limits every dwelling unit to a single bona fide 'family' housekeeping unit, excluding transient group occupancy. The code has no separate-sale clause; the apartment remains an accessory use of the house lot.
Land Development § 113-11D(8) to (11) and § 113-10P; Affordable Housing § 114-6C (Ord. No. 3-2026); Accessory Apartment Manual (Res. No. 72-2026; MON-L-376-25 filing of 3-11-2026, pp. 78 to 86); Rental Property §§ 134-1, 134-2, 134-4, 134-10A, 134-13, 134-16 (Ord. No. 07-2022); Business and Rental Unit Insurance Registration §§ 116-2 to 116-4 (Ord. No. 01-2023)The fine print: 12 caveats that can change the picture
- Affordable-only program: every ADU permission in Avon-by-the-Sea is a deed-restricted, income-qualified accessory apartment created through the borough's Fourth Round program (creation subsidy of $20,000 to $30,000 a unit, tenants placed by the administrative agent, owner living on site). DCA's Affordable Housing Municipal Status Report (7-1-26 file, February 2026 reporting) lists no accessory apartment among the borough's affordable units. A market-rate ADU of any kind needs a d(1) use variance.
- Legacy second units: the state's MOD-IV tax records list two or more dwellings on 200 of the borough's 1,004 residential (class 2) parcels. In the R district such units (garage apartments, rear cottages, two-family houses) can exist only as preexisting nonconforming uses; they may be repaired and renovated under § 113-11C(11) and (12), but enlarging or rebuilding them needs Planning Board relief (§ 113-20D), which the board granted for existing rear dwellings at 314 Norwood Avenue (5-27-2025), 112 Garfield Avenue (3-23-2026) and 424 Garfield Avenue (6-22-2026).
- Detached units: § 113-11D names accessory buildings and the 2026 manual contemplates 'the construction of a new accessory structure', but the R district's accessory building rules (one 26 by 26 foot garage with no bathroom or kitchen, a 100-square-foot shed, no living space on any garage's first floor, nonhabitable storage of no more than six feet of standing room above a garage) leave conversion of an existing garage apartment or cottage as the only detached route that needs no further relief.
- Conflicting program terms: § 113-11D(10) requires affordability controls of at least 30 years for R-district accessory apartments, while § 114-6C(3) (Ord. No. 3-2026) and the March 2026 manual require at least 10 years and § 114-16B sets 40 years for other restricted rental units; rent caps also differ (57.5 percent of median under § 113-11D(9) against the manual's 60 percent moderate-income and 45 percent low-income maximums). § 114-6C(2) names only the GC and M-O/R districts as accessory apartment zones, omitting the R and DC districts, although the court's 4-23-2026 compliance certification counts 'R-Single Family Residential Accessory Apartments' toward the borough's unmet need.
- Prior-round condition: § 113-11D(12) still lists 'The Borough has not met its 1987-1999 housing obligation' among the conditions. The June 2025 Housing Element and Fair Share Plan's Appendix E would strike it, along with conditions (8) to (10), but was never adopted, and the 4-23-2026 compliance certification covers the 20-unit prior round obligation through a realistic development potential of 6, so how the Planning Board would read the condition is untested.
- Promised but unadopted Chapter 113 amendments: the plan's Appendix E (R district: separate entrance, very low-income units, subsidies of $25,000 to $50,000, 30-year controls, and an application checklist that cites a nonexistent '§ 35-20 of the Borough Zoning Ordinance') and Appendix F (GC, M-O/R and DC: a 20 percent set-aside with at least one affordable unit, which the compliance certification says 'will be amended'). No Chapter 113 ordinance appears among Ord. Nos. 1-2026 to 16-2026 or on Planning Board agendas through 10-26-2026, and a Master Plan reexamination funded by Ord. No. 13-2025 was still in committee. Re-check by 2027-04-30.
- Commercial zones: in the GC, M-O/R and DC districts 'accessory apartments' are a separate conditional use for apartments above the first floor of commercial or office buildings, at least half affordable, with 30-year controls (§§ 113-12B(3), 113-13B(3), 113-14B(2)); they are not house-lot ADUs. The North End Redevelopment Plan (2020, amended 2021) overlays part of the GC district with townhouse rules and its own set-aside, and the MLC district (§ 113-16) holds age-restricted affordable garden apartments and townhouses.
- Lot gate: § 113-11D(2) requires a conforming lot (7,000 square feet, 50 feet wide, 100 feet deep). On the state MOD-IV parcel layer 264 of the 457 residential parcels with recorded dimensions (58 percent) qualify; the common lot is 50 by 140 feet, exactly 7,000 square feet, and about a third of dimensioned parcels are under 5,000 square feet.
- Chapter 114 trap: the 'accessory apartments' definition in § 114-2 (Ord. No. 3-2026, the DCA model text 'also referred to as accessory dwelling units') reaches detached units built from scratch, but it is affordable-housing administration, not a zoning permission; the zoning rights come only from § 113-11D and the commercial-zone conditional uses.
- Flood hazard areas: lots near the ocean, Sylvan Lake and the Shark River fall under Chapter 104 (Ord. No. 15-2022) and § 113-10S, which set the lowest floor of every building in the flood hazard area above the base flood elevation by the freeboard Chapter 104 requires.
- Costs that come with a unit: water and sewer each carry a $385 annual minimum 'for each unit' (§§ 168-20A, 136-27); § 115-4A charges a 1.5 percent development fee on the added value 'when an additional dwelling unit is added to an existing residential structure', while § 115-4B(1) exempts affordable housing developments included in the housing element, and the code does not say which applies to a single program unit; a residential use variance costs $350 a lot plus a $1,800 escrow (§ 113-47B(4)).
- New Jersey has no ADU statute. S1786 (reported with amendments 6-1-2026, now in Senate Budget and Appropriations, no action since) would make ADUs a permitted use as of right on lots allowing single- or two-family homes, with no added off-street parking, ministerial approval within 60 days and a 30-day minimum rental for new ADUs. Avon-by-the-Sea (1,933 people on 0.426 square miles of land in the 2020 census, about 4,540 per square mile) falls under the bill's under-9,000 branch; whether the 2006 affordable accessory apartment conditional use counts as an ordinance 'permitting and providing a reasonable opportunity for the development of accessory dwelling units' in effect on or before January 1, 2025, which would exempt the borough, is untested.
Summarized from Avon-by-the-Sea's ordinance text, read October 2026; every row links the code section it came from. Rules often vary by zone and lot, so treat this as orientation, not a permit determination, and confirm with the planning department before you commit to a design.
ADU regulations
Short-term rental rules
Planning to rent your ADU on Airbnb or VRBO? Avon-by-the-Sea regulates short-term rentals separately; check these before counting on nightly rental income.
Spotted something outdated?
Zoning codes change. If a link is dead or Avon-by-the-Sea has updated its ordinance, report it and we'll verify against the official source.
Report a correctionReady to build?
Planning an ADU in Avon-by-the-Sea?
Tell us about your project and we'll match you with vetted local designers and builders as we bring them online. No cost, no obligation.