These are the primary sources for accessory dwelling unit regulations in Spokane: the city's own zoning code, planning department pages, and permit guides. Start here before talking to anyone: the rules below are what your permit reviewer will apply.

Rules at a glance

Detached (backyard) ADU
Allowed

Detached backyard ADUs are permitted outright in every Spokane residential zone (RA, R1, R2, RMF, RHD), including inside planned unit developments, and Table 17C.111.115-1 lists Accessory Dwelling Unit as 'P' (permitted) in all five. Two ADUs are allowed per lot. A detached ADU may be built on a site with an existing residential use, built together with a new home, or converted from an existing accessory structure such as a garage; in R1, R2, RMF and RHD it may even go on a site whose principal structure is non-residential. Detached units get their own relaxed siting standards: 25 ft height, 5 ft rear setback or 0 ft where the lot abuts an alley, and side setbacks matching the primary structure.

SMC 17C.300.100(A), (B); SMC 17C.300.130(A)(1); Table 17C.111.115-1
Attached or internal ADU
Conditional

Attached and internal ADUs are permitted in the same five residential zones with no hearing and no discretionary review, but Spokane gates them on the size of the existing house: the principal structure must have at least 1,000 sq ft of floor area, excluding an attached garage, before an attached ADU can be established. That threshold bites in Spokane's older housing stock because SMC 17A.020.060 defines floor area as the above-ground portion of a building and excludes any floor sitting four feet or more below the adjacent right-of-way, so a full basement generally does not count toward the 1,000 sq ft. Owners of small bungalows can therefore be shut out of a basement or attic conversion and pushed toward a detached unit instead. No such minimum applies to detached ADUs.

SMC 17C.300.110(A)(1); SMC 17C.300.130(A)(1)(a), (b), (d); SMC 17A.020.060 (Floor Area)
Maximum size
1,000 sq ft for an attached ADU and 1,000 sq ft of floor area for a detached ADU. Detached units are also capped at a 1,200 sq ft maximum building footprint and 25 ft in height, and count against the zone's total building coverage (50% RA, 65% R1, 80% R2, 100% RMF and RHD). The attached cap excludes any related garage area, and a conversion of existing interior basement or attic space may exceed 1,000 sq ft.

The 1,000 sq ft figures came in with ORD C36696 (effective July 11, 2025), replacing the old 800 sq ft attached and 975 sq ft detached caps, and they match the floor RCW 36.70A.681(1)(f) sets for cities once the state ADU mandate binds them. The limits stack, and on a tight lot the practical ceiling is often site coverage rather than the 1,000 sq ft number: building coverage counts the house and every accessory structure together, and R1 and R2 lots are separately held to 60 percent impervious coverage (40 percent inside an Area of Drainage Concern) unless an engineer's stormwater drainage plan is submitted. An attached ADU also counts inside the maximum building footprint per primary building, which is 2,450 sq ft in R1 and R2 on lots of 7,000 sq ft or less and 35 percent on larger ones. Basement and attic conversions are the one route past the 1,000 sq ft ceiling.

SMC 17C.300.110(A)(1)(a), (b), (A)(2); SMC 17C.300.130(B)(2), (B)(3); Tables 17C.111.205-1 and 17C.111.205-2
Owner occupancy
Depends

No owner occupancy is required for an ordinary ADU, whether the owner lives on site or not, and no deed restriction is recorded any more. The requirement returns only if the lot also holds a short-term rental permit under Chapter 17C.316: then one of the dwelling units on the lot must be occupied by an owner as their permanent and principal residence for more than six months of each calendar year, and that owner may not collect rent on it. On such a lot the ADU approval is not transferable except to a new owner who will occupy it, and the approval expires if the titleholder stops owning and residing in either unit. Owners can ask the director to waive the requirement for up to a one-year absence for good cause such as a job dislocation, sabbatical, education or illness.

SMC 17C.300.110(B); SMC 17C.300.140(A), (B)(3)
Extra parking
None. Spokane has no off-street parking minimum for any use citywide, so an ADU adds no required spaces.

SMC 17C.300.130(A)(3) sends ADU parking to Chapter 17C.230, and SMC 17C.230.110(A) states flatly that except as provided in that chapter there is no required minimum number of off-street parking spaces. Spokane deleted its minimums citywide with ORD C36629, effective March 6, 2025, which also rewrote the summary table so the 'minimum required' column reads None for residential household living. The only route back to a minimum is SMC 17C.230.110(B), which lets a required number be attached as a condition of a Conditional Use permit, and ADUs are not a conditional use. Chapter 17C.230 still sets parking maximums, and SMC 17C.300.140(B)(2) keeps a vestigial expiration clause about ceasing to maintain 'the required' spaces, which has no work to do while no spaces are required.

SMC 17C.230.110(A); SMC 17C.300.130(A)(3); Table 17C.230.020-1
Approval process
Permitted use

Purely administrative. SMC 17C.300.120(A) says an owner seeking to establish an ADU must obtain a building permit and a certificate of occupancy from the building services department, and that is the whole procedure: no land use application, no hearing, no notice to neighbors, and no recorded deed restriction. Table 17C.111.115-1 lists ADUs as 'P', permitted, in all five residential zones, in contrast to mobile home parks (CU) and short-term rentals (P/CU). The unit must still meet building, electrical, fire and plumbing code and use the principal dwelling's municipal utilities and address.

SMC 17C.300.120(A); Table 17C.111.115-1; SMC 17C.300.130(A)(5), (6)
Rental restrictions
Long-term renting is unrestricted, subject only to the citywide residential rental registration (business license plus $15 per unit per year). Short-term rental of an ADU is allowed with a short-term rental permit, but then one unit on the lot must be owner-occupied for more than six months a year.

Chapter 17C.300 imposes no minimum lease term, no cap on rent, and no restriction on renting the ADU or the main house to anyone. Renting for 30 days or more triggers SMC 10.57.020, the residential rental registry adopted in 2023, which requires an annual business license and registration of each unit at $15 per unit per year. For stays under 30 nights, SMC 17C.316.040(B) allows one short-term rental in an accessory dwelling unit, and allows one in the house and one in the ADU at the same time, in both cases subject to the owner occupancy requirement of SMC 17C.300.110(B); the permit requires a city business license, a notarized life safety form, liability insurance under Chapter 64.37 RCW, a neighbor notification letter, and $200 to apply plus $100 a year to renew in residential zones. Spokane's code is silent on selling an ADU separately, and nothing in Chapter 17C.300 prohibits condominiumizing one.

SMC 17C.316.040(B), (C), (E), (F); SMC 10.57.020(A), (B); SMC 17C.300.110(B)
The fine print: 10 caveats that can change the picture
  • Chapter 17C.300 governs ADUs only in the residential zones RA, R1, R2, RMF and RHD; Table 17C.111.115-1 lists ADU as 'P' in each. There is no ADU allowance in Spokane's commercial, downtown or form-based code zones under this chapter.
  • Two ADUs are allowed per lot (SMC 17C.300.100(B)). SMC 17C.300.100(C) also lets an applicant choose whether a second unit is permitted as an ADU or as a principal dwelling when it meets both definitions, which matters because the middle-housing rules in Chapter 17C.111 allow additional principal units outright in R1 and above.
  • The attached-ADU house-size gate is the one condition most likely to surprise: the principal structure must have at least 1,000 sq ft of floor area, excluding an attached garage, before an attached or internal ADU can be established (SMC 17C.300.110(A)(1)), and SMC 17A.020.060 counts only above-ground floor area, excluding floors four feet or more below the adjacent right-of-way. Detached ADUs face no such minimum.
  • A detached ADU is capped three separate ways: 1,000 sq ft of floor area, a 1,200 sq ft maximum building footprint (Table 17C.111.205-2), and the zone's total building coverage, which counts all primary and accessory structures (Table 17C.111.205-1 note 5: 50% RA, 65% R1, 80% R2, 100% RMF and RHD). Impervious coverage is the tighter site limit in RA, R1 and R2 (50%, 60% and 60%, or 40% inside an Area of Drainage Concern) unless an engineer's stormwater drainage plan is submitted under SMC 17D.060.135. An attached ADU is additionally counted inside the maximum building footprint per primary building (2,450 sq ft in R1 and R2 on lots of 7,000 sq ft or less, 35% on larger lots) per SMC 17C.300.130(B)(3).
  • Owner occupancy applies only when the lot also carries a short-term rental permit. On those lots the ADU approval is not transferable and expires if the titleholder stops owning and residing in one of the units (SMC 17C.300.110(B), 17C.300.140).
  • State-law timing: Spokane is an early adopter, not a laggard. RCW 36.70A.130(5)(c) puts Spokane County jurisdictions' periodic comprehensive plan update on or before December 31, 2026, and RCW 36.70A.680(1)(a) as amended by 2025 c 148 makes the HB 1337 ADU mandate take effect at the same time (the original 2023 text said six months after). Spokane adopted its HB 1337 code with ORD C36696 effective July 11, 2025, roughly 18 months early. Its comprehensive plan update, PlanSpokane 2046, is due at the end of 2026.
  • Two features to re-test against RCW 36.70A.681 once the state mandate binds on December 31, 2026: the 1,000 sq ft minimum principal-structure floor area for attached ADUs, which has no counterpart in the statute's requirement to allow at least two ADUs in any of the listed attached and detached combinations; and the short-term-rental owner occupancy condition, which RCW 36.70A.680(5)(a) appears to preserve because it restricts short-term rental use rather than ADU use generally.
  • Transportation impact fees carry a dedicated ADU line charged at the multi-family 3 to 10 level rate, about 41 percent of the single-family detached rate ($103.58 versus $249.65 in the Downtown District, $379.19 versus $913.93 in the Northwest District), already inside the 50 percent cap of RCW 36.70A.681(1)(a). 2026 schedule adopted by ORD C36842, effective January 1, 2026 (SMC 17D.075.180 Appendix A).
  • The city's own ADU handouts lag its code. The 2016 'Accessory Dwelling Unit Overview' PDF (zones RSF/RSF-C/RTF, one ADU per lot, 5,000 sq ft minimum lot, 800 and 600 sq ft caps, one added parking space, recorded deed restriction) and the August 2022 'Current Allowances' sheet (800 sq ft attached, 975 sq ft or 75 percent detached, parking by bedroom count) are both superseded. The 2022 sheet is still linked from the city's Business and Development Resources page. Read Chapter 17C.300 rather than either handout.
  • BUILDSpokane, a comprehensive rewrite of Title 17 with Clarion Associates, was still in the drafting phase as of a July 23, 2026 council study session, and it runs alongside PlanSpokane 2046. Expect Chapter 17C.300 to be renumbered or restructured, so re-verify after the 2026 periodic update lands.

Summarized from Spokane's ordinance text, read August 2026; every row links the code section it came from. Rules often vary by zone and lot, so treat this as orientation, not a permit determination, and confirm with the planning department before you commit to a design.

Compare Spokane with 16 nearby cities

ADU regulations

Short-term rental rules

Planning to rent your ADU on Airbnb or VRBO? Spokane regulates short-term rentals separately; check these before counting on nightly rental income.

Washington statewide law also applies

Washington sets baseline ADU rights at the state level. Where local rules are stricter than state law allows, state law usually wins, so both are worth reading.

See Washington statewide rules

Spotted something outdated?

Zoning codes change. If a link is dead or Spokane has updated its ordinance, report it and we'll verify against the official source.