City · California
ADU rules in Pasadena
These are the primary sources for accessory dwelling unit regulations in Pasadena: the city's own zoning code, planning department pages, and permit guides. Start here before talking to anyone: the rules below are what your permit reviewer will apply.
Rules at a glance
Detached ADUs are a permitted use in every RS and RM district and in the commercial, public-semipublic and specific-plan mixed-use zones that allow housing, on any lot with a proposed or existing dwelling. A single-family lot may combine one new-construction ADU (detached or attached), one conversion ADU and one junior ADU, and an 800 sq ft new-construction Exemption ADU with 4 ft side and rear setbacks is always available. A lot with an existing multifamily building may add up to eight detached ADUs (never more than its existing unit count), and a lot with a proposed multifamily building two. On Hillside Overlay lots served by streets 26 ft wide or narrower only the 800 sq ft exemption unit or a conversion is allowed, and lots created by an SB 9 urban lot split that use the two-unit provisions get no new ADU.
Pasadena Municipal Code § 17.50.275.B.1-2 and D.1.b (Ord. 7464, adopted 1-26-2026); § 17.22.030 Table 2-2 and note (5)Attached new-construction ADUs (additions, including second-story units up to 25 ft and two stories) and conversions of existing space in the house, a garage or another accessory structure are permitted on the same terms as detached units, and a junior ADU of up to 500 sq ft may be created inside the single-family house or attached garage. On multifamily sites, ADUs can be converted from non-livable space such as storage rooms, attics, basements and garages: at least one, and up to 25 percent of the existing units. A conversion may add up to 150 sq ft for ingress and egress, an attached conversion needs its own exterior entrance, and on single-family sites a new attached non-exemption ADU's entrance and exterior stairs must not be visible from the street unless that would prevent the unit.
PMC § 17.50.275.B.2.a-b, D.3.c(1), D.3.d and E.2On single-family sites a new detached ADU may reach 1,200 sq ft and a new attached ADU 850 sq ft (studio or one bedroom) or 1,000 sq ft (more than one bedroom). New units of 800 sq ft or less with 4 ft side and rear setbacks are Exemption ADUs, which skip the zone's lot coverage, floor area and encroachment-plane limits and may sit in the front yard, and conversions of existing space have no size cap; units over 800 sq ft must meet the underlying zone's standards, the front-yard setback and a 6 ft building separation. In Hillside Overlay districts (except HD-1, Upper Hastings Ranch) detached units cap at 1,000 sq ft, and on lots served by streets with 26 ft or less of pavement (about 1,600 lots) new construction is limited to 800 sq ft. Detached units may be 18 ft and two stories (16 ft in hillside overlays, in landmark or historic districts where visible from the street, and for exemption units in the front-yard setback, rising to 18 ft near major transit or beside multistory buildings, plus 2 ft to match roof pitch near transit); attached units 25 ft or the zone limit; multifamily-site exemption ADUs have no size cap.
PMC § 17.50.275.D (intro), D.1 (unit size), D.3.a-c (setbacks, separation, height), E.2.e (JADU); Ord. 7464 Appendix A findingsPasadena imposes no owner-occupancy requirement on ADUs, at application or afterward, consistent with Gov. Code 66315, which bars one. Owner occupancy applies only to a junior ADU that shares sanitation facilities with the house: then either the house or the JADU must be owner-occupied (not required where the owner is a government agency, land trust or housing organization), and the owner must record a city covenant before the building permit issues. A JADU with its own bathroom carries no occupancy rule, which matches the current state rule in Gov. Code 66333(b).
PMC § 17.50.275.E.3 and E.5; Gov. Code §§ 66315, 66333(b)The code requires one space (covered, uncovered or tandem on the existing driveway) for an ADU on a single-family site, but waives it for Exemption ADUs, sites within a half-mile walk of a public transit stop (any fixed-route bus stop counts under Gov. Code 66313(m)), units within existing or proposed space, landmark and historic districts, lots within one block of a car-share location, and ADUs filed with a new house that meet another exemption. ADUs on multifamily sites need no parking, and a garage, carport or space demolished or converted for an ADU or JADU need not be replaced. In practice the space reaches only a new unit over 800 sq ft on a single-family lot away from transit, mostly in the hillside areas the city's own findings describe as thinly served; on a plain reading of Gov. Code 66314(d)(10)(A) (one space per unit or per bedroom, whichever is less) a studio owes none.
PMC § 17.50.275.D.4 and E.7; Gov. Code §§ 66314(d)(10)-(11), 66322(a)ADU and JADU applications are ministerial: the Planning Director approves, conditionally approves or denies them within the Gov. Code 66317, 66320 and 66335 time limits (15 business days for completeness, 60 days to decide, no hearing), and plans go through the city's online CSS permit portal and plan check. Two older chapters lack an ADU carve-out: the Hillside Development Permit rule lists any new dwelling or structure in the HD and HD-SR overlays (17.29.030.A.2), and 17.62.090.A requires a Certificate of Appropriateness for new construction in landmark and historic districts. Gov. Code 66317(a)(1) and (c) keep ADUs out of discretionary review, so only objective standards such as the not-visible-from-the-street rule apply.
PMC § 17.50.275.A.2; §§ 17.29.030.A, 17.62.090.A; Gov. Code § 66317Any rental of an ADU or JADU legally created on or after January 1, 2017 must be for a term longer than 30 days, and 17.50.296.E.2.c bars ADUs and accessory structures permitted after that date from the short-term rental program; an older permitted ADU may be short-term rented only as part of the host's primary residence under an annual STR permit (host in residence nine months a year, 90 un-hosted nights a year, TOT and TBID). Rented ADUs and JADUs are Rental Units under Charter Article XVIII (Measure H): they must be registered every year (September 1 to October 31; $236.54 per unit for FY 2026-27) and carry just-cause eviction protection, while rent caps reach only units built before February 1, 1995. ADUs may not be sold separately except through a qualified nonprofit under Gov. Code 66341; Pasadena has not opted into 66342 ADU condominiums.
PMC § 17.50.275.C.1-2, E.4, E.6; § 17.50.296.B.1, E.2.c, F.4; City Charter Art. XVIII §§ 1803, 1804, 1812The fine print: 12 caveats that can change the picture
- Uncodified Ord. 7471 (adopted 6-22-2026 by an 8-0 vote; its Municode bank PDF was still the 56,769-byte processing placeholder on 2026-10-06, so the text was read from the 6-22 council packet, identical to the 6-15 first-reading exhibit) restates 17.50.275: it adds a 4 ft minimum FRONT setback to the 800 sq ft Exemption ADU, splits the height rules into single-family and multifamily-site subsections, and moves the second-story window limit (no new windows facing interior side or rear lot lines set back less than 5 ft, clerestory where the Building Code requires one) from the JADU subsection to non-exemption ADUs. The front setback is not in the staff summary and sits uneasily with Gov. Code 66323(b), which bars standards beyond size and height on state-exempt units.
- Size caps are gross floor area measured under Title 17 Article 8 (to the outside of exterior walls in RS and RM-12) or the California Building Code, at the applicant's choice, while Gov. Code 66321(b)(2)-(3) and 66323(a)(2)(A) now state the 850/1,000 and 800 sq ft floors in interior livable space (SB 543, 1-1-2026); under the code's own state-law-prevails clause (17.50.275.A.1) and Gov. Code 66325, the state measure governs where it allows a larger unit.
- Hillside Overlay lots on streets with 26 ft or less of pavement (about 1,600 properties, 5.3 percent of single-family lots, per Ord. 7464 Appendix A findings on fire access, very high fire hazard zones and evacuation) get only the 800 sq ft exemption ADU or a conversion, which the city justifies under Gov. Code 66314(a) area designation for traffic and public safety; HD-1 (Upper Hastings Ranch) follows the ordinary single-family rules.
- Landmark and historic districts and individually designated properties: non-exemption ADUs must not be visible from the public right-of-way unless that prevents the unit, and no parking is required. 17.62.090.A still requires a Certificate of Appropriateness for new construction in those districts with no ADU exception, and two new landmark districts (LD-29 Arboleda Drive and LD-30 Mesita Road, Ords. 7475 and 7476) took effect 9-26-2026; review must stay ministerial and objective under Gov. Code 66317.
- The city's ADU hub page (modified 2026-05-18) still says the current rules took effect May 20, 2024 under Ord. 7420 and prints the pre-2026 parking wording (one space per unit or per bedroom, with no Exemption ADU exception); PMC 17.50.275 as amended by Ord. 7464 governs. The hub was replaced in the directory by the current ADU Standard Plans page.
- HCD's only ADU-law letter to Pasadena is the 2-26-2025 findings on Ord. 7420 (66323 unit combinations, SB 1211 multifamily detached counts and AB 2533 legalization, legacy 65852.2 citations, front setbacks for 800 sq ft units, two-story attached units, parking for exemption units), marked 'Response received'; Ord. 7464 amended every flagged clause. The dashboard (newest row 9-23-2026) shows no letter on Ord. 7464 or 7471, and no public record shows whether either reached HCD within 60 days (Gov. Code 66326(a)); a missed submission would void the local ordinance under 66326(d) and leave state standards that largely match Pasadena's.
- SB 9 lots: Table 2-2 note (5) bars new ADUs and JADUs on lots created by an urban lot split that use the two-unit development provisions and caps such lots at two units of any type. The Eaton Fire SB 9 prohibition in very high fire hazard zones (Ords. 7455 and 7457) was repealed by Ord. 7474 on 8-3-2026.
- Fees: ADUs of 900 sq ft or less (and JADUs) pay no residential impact fee or traffic reduction fee, larger ADUs pay a fee proportional to the main dwelling (PMC 4.17.050.F.6, 4.19.040), and units under an optional seven-year Housing Agreement (ADU Landlord Agreement or Affordability Covenant at 120 percent of AMI) get further waivers. SB 1117 (Stats. 2026, ch. 809, effective 1-1-2027) limits impact fees on ADUs over 750 sq ft to the area above 750 sq ft, which will change the proportional charge for units over 900 sq ft.
- AB 956 (Stats. 2026, ch. 791, effective 1-1-2027) amends Gov. Code 66323 to allow two detached new-construction ADUs on a single-family lot under the state-exempt pathway, with no JADU owed where two exist; Pasadena's one-new-construction-unit count in 17.50.275.B.2.a(1) will then yield to state law.
- Rental term: the local 'longer than 30 days' rule matches Gov. Code 66323(e) and 66333(g) for exemption units and JADUs but goes one day beyond 66315, which lets a city require terms of 30 days or longer for other ADUs; the code's state-law-prevails clause would govern a 30-day lease of a non-exemption ADU, although 17.50.296 treats stays of 30 consecutive days or less as short-term rentals.
- Eaton Fire (January 2025; 185 structures destroyed in the city): the city's older ADU Standard Plans stay usable only on red-tagged properties, and Gov. Code 66328(b) (AB 462) lets a detached ADU receive its certificate of occupancy before the rebuilt primary dwelling where the house was substantially damaged or destroyed.
- Zones: use tables omit ADUs in OS, CG, IG and several specific-plan commercial or industrial subzones; the 2025 North Lake Specific Plan (Ord. 7477, effective 9-26-2026, uncodified) lists ADUs as permitted in its NL-MU-C and NL-MU-N zones. Re-read 17.50.275 when Municode codifies Ords. 7471 and 7477.
Summarized from Pasadena's ordinance text, read October 2026; every row links the code section it came from. Rules often vary by zone and lot, so treat this as orientation, not a permit determination, and confirm with the planning department before you commit to a design.
ADU regulations
- library.municode.comOfficial sourceVerified October 2026Code of Ordinances §17.50.275https://library.municode.com/ca/pasadena/codes/code_of_ordinances?nodeId=TIT17ZOCO_ART5STSPLAUS_CH17.50STSPLAUS_17.50.275ACDWUNJUACDWUN
- cityofpasadena.netOfficial sourceVerified October 2026https://www.cityofpasadena.net/planning/planning-division/community-planning/accessory-dwelling-units/adu-standard-plans-program/
- cityofpasadena.netOfficial sourceVerified October 2026https://www.cityofpasadena.net/rent-stabilization/rental-registry/
Short-term rental rules
Planning to rent your ADU on Airbnb or VRBO? Pasadena regulates short-term rentals separately; check these before counting on nightly rental income.
- library.municode.comOfficial sourceLive October 2026Code of Ordinances §17.50.296https://library.municode.com/ca/pasadena/codes/code_of_ordinances?nodeId=TIT17ZOCO_ART5STSPLAUS_CH17.50STSPLAUS_17.50.296SHRMRE
- cityofpasadena.netOfficial sourceVerified October 2026https://www.cityofpasadena.net/planning/short-term-rental-regulations/
California statewide law also applies
California sets baseline ADU rights at the state level. Where local rules are stricter than state law allows, state law usually wins, so both are worth reading.
See California statewide rulesSpotted something outdated?
Zoning codes change. If a link is dead or Pasadena has updated its ordinance, report it and we'll verify against the official source.
Report a correctionReady to build?
Planning an ADU in Pasadena?
Tell us about your project and we'll match you with vetted local designers and builders as we bring them online. No cost, no obligation.