City · California

ADU rules in Pittsburg

2 sources

These are the primary sources for accessory dwelling unit regulations in Pittsburg: the city's own zoning code, planning department pages, and permit guides. Start here before talking to anyone: the rules below are what your permit reviewer will apply.

Rules at a glance

Detached (backyard) ADU
Allowed

A detached ADU is allowed on any lot with a single-family or multifamily home in every residential district (RR, RS-40, RS-10, RS-6, RS-5, RS-4, RM, RMD, RH and RHD) and in planned development districts; the use tables list it as L-107, 'Permitted, subject to the requirements of PMC § 18.50.300 through § 18.50.315', and the OS and GQ tables carry the same entry. Schedule 18.50.315 (Ord. 23-1510, 2023) still allows only one ADU per single-family lot (attached or detached) plus a JADU, and only two detached ADUs beside a multifamily building; both counts yield to Gov. Code § 66323(a), which requires ministerial approval of a detached new-construction ADU of up to 800 sq ft in combination with a conversion ADU and a JADU on a single-family lot, and of up to eight detached ADUs (never more than the existing units) on a lot with an existing multifamily building. The Mixed Use (M) and commercial district tables allow multifamily housing but have no ADU row, and Hillside Planned District lots need a hillside planned development permit before any building permit (§ 18.56.050); state law (§§ 66314, 66317, 66323) controls in both cases.

PMC §§ 18.50.305 and 18.50.010 (L-107); Schedule 18.50.315, Number of Units (Ord. 20-1476, 2020; Ord. 23-1510, 2023); Gov. Code § 66323(a)(2), (a)(4)
Attached or internal ADU
Allowed

Attached ADUs (additions, and conversions of space inside the home or an existing accessory structure) are allowed on the same terms as detached units, and a JADU of up to 500 sq ft inside the walls of a single-family home is permitted with a single-family use in all zoning districts. On multifamily lots the code allows conversion ADUs in space not used as livable area up to 25 percent of the existing units; § 66323(a)(3) also guarantees at least one. Schedule 18.50.315 describes one attached ADU per lot plus a JADU, but under § 66323(a)(1) and (a)(2) a conversion ADU and a JADU can be combined with a detached state-exempt unit; HCD's 12-22-2021 findings had already told the city that the table's unit counts understated the permissible combinations.

PMC §§ 18.50.302 and 18.50.305; Schedule 18.50.315, Number of Units; Gov. Code § 66323(a)(1)-(3)
Maximum size
1,200 sq ft detached; attached 50% of the home up to 1,200 sq ft, with 850 sq ft (1,000 sq ft for 2+ bedrooms) always allowed; 800 sq ft state-exempt unit; JADU 500 sq ft; 16 ft detached (18 ft near major transit), 25 ft attached

Schedule 18.50.315 caps a detached ADU that is not a statewide exemption unit at 1,200 sq ft, and an attached one at the lesser of 50 percent of the primary dwelling's floor area or 1,200 sq ft, while always allowing 850 sq ft, or 1,000 sq ft with more than one bedroom, regardless of the 50 percent limit. A 'Statewide Exemption ADU' of up to 800 sq ft is allowed in either form and is exempt from lot coverage and FAR; JADUs are capped at 500 sq ft. Detached units may be 16 ft tall, or 18 ft within one-half mile walking distance of a major transit stop or high-quality transit corridor (plus 2 ft to match the main roof pitch) or on a lot with a multistory multifamily building; attached units may reach 25 ft, and a 3:12 minimum roof pitch applies. The schedule states sizes in plain square feet while state law measures the 850/1,000 sq ft floors and the 800 sq ft allowance in interior livable space (§ 66321(b)), and conversions under § 66323(a)(1) carry no size cap beyond the 150 sq ft expansion allowance. If the 2023 ordinance were treated as void under § 66316 (see caveats), the state defaults would apply: 1,200 sq ft detached and attached 50 percent of the existing home with no 1,200 sq ft ceiling (§ 66314(d)(4)-(5)).

PMC Schedule 18.50.315, Maximum Unit Size and Height (Ord. 23-1510 § 3, 2023); PMC § 18.50.302; Gov. Code §§ 66314(d)(4)-(5), 66321(b), 66323(a)
Owner occupancy
Not required

Nothing in Article IV requires an owner to live on a lot with an ADU, and Gov. Code § 66315 bars such a condition. For JADUs, § 18.50.310(F) still says the primary dwelling and JADU 'shall be separately occupied only if the owner occupies one of the units' and requires a recorded deed restriction (owner occupancy is waived when the owner is a governmental agency, land trust or housing organization). Since 1-1-2026, Gov. Code § 66333(b) allows owner occupancy only when the JADU shares sanitation facilities with the home, so a JADU with its own bathroom carries no owner-occupancy requirement despite the local text. The city's JADU deed restriction form (created March 2022) still prints the universal rule; the pending AP-26-0067 rewrite would adopt the shared-sanitation test.

PMC § 18.50.310(A), (F); Gov. Code §§ 66315, 66333(b)
Extra parking
1 space per ADU (tandem allowed) unless exempt; none for JADUs, conversions, state-exempt units, or within 1/2 mile walking distance of public transit

Schedule 18.50.315 requires one space for an attached or detached ADU, which may be tandem with the main home's required parking, and none for a JADU. No space is required within one-half mile walking distance of a public transit stop (bus stops count), in an architecturally and historically significant historic district, for a unit entirely within the existing or proposed home or an existing accessory structure that adds no floor area, where on-street parking permits are required but not offered, within one block of a car share vehicle, or when the ADU is filed together with a new home on the same lot. A garage, carport or covered parking structure demolished or converted for an ADU need not be replaced, and state law extends that to uncovered spaces (§ 66314(d)(11)). The flat one-space rule exceeds the state ceiling of one space per unit or per bedroom, whichever is less (§ 66314(d)(10)(A)), so a studio arguably owes none, and units built under the § 66323 state-exempt pathway owe none (§ 66323(b)).

PMC Schedule 18.50.315, Required Parking and notes a-c (Ord. 23-1510 § 3, 2023); Gov. Code §§ 66314(d)(10)-(11), 66322(a), 66323(b)
Approval process
Permitted use

§ 18.50.310 says a compliant ADU or JADU application 'shall be processed ministerially' through the staff zoning approval that precedes a building permit (§ 18.32.010(B)), and an application is deemed approved if not acted on within 60 days of being deemed complete; the residential use tables list ADUs as permitted (L-107), with no use permit or hearing. State law adds the 15-business-day completeness check and the 60-day ministerial clock (§ 66317). Older general paths could be read to reach ADUs: § 18.36.100 lets the city planner refer a doubtful single-family building permit to the Planning Commission, § 18.36.200 sends building designs in other districts to the Commission, and Hillside Planned District lots need a hillside planned development permit (§ 18.56.050); none is ADU-specific, and § 66317(a)(1) bars discretionary review or a hearing for an ADU permit. The subjective design findings in § 18.50.310(D) and the schedule's requirement that a detached unit 'be in harmony with the primary dwelling unit or convey the appearance of a single-family home' exceed the objective-standards limit of § 66314(b)(1).

PMC §§ 18.50.310 and 18.32.010(B); PMC § 18.50.010 (L-107); Gov. Code §§ 66314(b)(1), 66316, 66317
Rental restrictions
No rentals of 30 days or less (31-day minimum, so no short-term rentals); rented ADUs and JADUs must register with the Residential Rental Property Inspection Program; no separate sale except through a qualified nonprofit (§ 66341)

§ 18.50.310(H) requires an owner who rents an ADU or JADU to register it with the city's residential rental inspection program (PMC Chapter 15.91: registration and annual fees set by council resolution, periodic inspections, three-year self-certification for well-kept properties) and provides that no ADU or JADU 'shall be rented for a term of 30 days or less'. That 31-day floor matches the longer-than-30-day terms state law requires for JADUs (§ 66333(g)) and state-exempt units (§ 66323(e)), but it is one day stricter than § 66315 allows for ordinary ADUs (terms of 30 days or longer). Pittsburg has no short-term rental ordinance; the code has no short-term or vacation rental provisions, so the 30-day bar is the operative short-term rule for ADUs. Units may be rented but not sold separately except to a qualified nonprofit under § 18.50.310(A) (citing legacy § 65852.26, now § 66341); the JADU deed restriction bars separate sale, and the city has not opted into § 66342 ADU condominiums.

PMC §§ 18.50.310(A), (H), 15.91.020 and 15.91.060; Gov. Code §§ 66315, 66323(e), 66333(g), 66341
The fine print: 7 caveats that can change the picture
  • Which text governs: Chapter 18.50 Article IV as amended by Ord. 23-1510 (adopted on consent 9-18-2023) is the codified and administered text (eCode360 'Includes legislation through 12-15-2025', no New Laws), and state law overrides its conflicting clauses. HCD's 5-11-2026 Technical Assistance Letter - Repeal Request (ADU0008362) says the 2023 ordinance on file 'may be outdated and out of compliance', cites the § 66316 rule that a noncompliant ordinance is null and void, and asked for a repeal or update plan by 6-10-2026; neither HCD's letter index (current to 7-14-2026) nor its dashboard records a response, and the city's 7-28-2026 staff report concedes that 'portions of Chapter 18.50 are inconsistent with current State statutes and are therefore no longer in compliance'. Under a void reading the § 66314(d) defaults apply (1,200 sq ft detached, attached 50 percent of the existing home with no 1,200 sq ft ceiling) and the local 30-day rental bar would lapse for ordinary ADUs. The § 66326(d) automatic-void rule is not triggered: the 2026 letter is technical assistance, not § 66326(b) findings, and HCD's earlier 12-22-2021 findings on Ord. 20-1476 were answered.
  • Pending rewrite: Planning Application AP-26-0067 (filed 6-1-2026; Planning Commission recommended adoption 4-0 on 7-28-2026; not on any council agenda through 10-5-2026) would restate Article IV with state-exempt and non-exempt tracks (any combination of exempt units plus one non-exempt unit, up to eight detached exempt units at an existing multifamily building), detached non-exempt units of 1,200 sq ft of interior livable space, attached units up to the greater of 50 percent of the home or 850/1,000 sq ft (no 1,200 sq ft ceiling), one space per unit or bedroom whichever is less with no parking for exempt units or JADUs, JADU owner occupancy only with shared sanitation, the same 30-days-or-less rental bar, separate conveyance only under § 66341, a 5 ft separation from other structures, a 15-business-day completeness check with appeal to the Zoning Administrator, and a new § 18.50.320 under which state law supersedes. Re-check council agendas and eCode360 New Laws from 10-19-2026.
  • Local text overridden by state law (recorded as overridden, not as the rule): the one-ADU-plus-one-JADU count on single-family lots and the two-detached-ADU cap on multifamily lots (§ 66323(a)); universal JADU owner occupancy in § 18.50.310(F) (§ 66333(b)); the one-space rule reaching studios and state-exempt units (§§ 66314(d)(10)(A), 66323(b)); the garage-only replacement parking exemption (uncovered spaces too, § 66314(d)(11)); subjective design compatibility (§ 66314(b)(1)); and the front-yard prohibition and corner-side-yard sight-triangle rule HCD flagged in 2021, which survive in Schedule 18.50.315 with only the 800 sq ft state-exempt unit protected from the front-yard bar. The article still cites legacy Gov. Code §§ 65852.1 and 65852.26 (now §§ 66310 et seq. and 66341).
  • Zone gaps: the Mixed Use (M) table (§ 18.53.020) and the commercial table (§ 18.52.010) allow multifamily housing but list no ADU, § 18.50.305 names only residential and planned development districts, and the Hillside Planned District requires a hillside planned development permit before any building permit (§ 18.56.050); § 66323(a) requires ministerial approval of state-exempt units in residential and mixed-use zones, and § 66317 bars discretionary review of ADU permits.
  • City materials: the city ADU page says the November 2024 ADU Guidebook and Permit-Ready ADU Submittal Requirements are being updated (no links) and that permit-ready plans are unavailable because of building code updates; its linked JADU deed restriction form (created March 2022) imposes the universal owner-occupancy rule and cites a § 18.50.310(I) that is now (H).
  • 2026 session: SB 1117 (Chapter 809, Statutes of 2026) and AB 956 (Chapter 791, Statutes of 2026) take effect 1-1-2027. AB 956 lets a single-family lot have two detached new-construction state-exempt ADUs (no JADU owed where two exist), further overriding Schedule 18.50.315's one-detached count; SB 1117 limits impact fees on an ADU over 750 sq ft to the area above 750 sq ft. Article IV contains no fee provisions.
  • Code platform: the city's Municipal Code page embeds eCode360 PI4590; www.codepublishing.com/CA/Pittsburg still serves a frozen copy current only through Ord. 25-1531 (6-2-2025) whose Article IV text is identical, so do not use it for currency. A comprehensive Title 18 and zoning map update (Placeworks contract approved 4-6-2026) may later renumber the ADU article.

Summarized from Pittsburg's ordinance text, read October 2026; every row links the code section it came from. Rules often vary by zone and lot, so treat this as orientation, not a permit determination, and confirm with the planning department before you commit to a design.

Compare Pittsburg with 119 nearby cities

ADU regulations

California statewide law also applies

California sets baseline ADU rights at the state level. Where local rules are stricter than state law allows, state law usually wins, so both are worth reading.

See California statewide rules

Spotted something outdated?

Zoning codes change. If a link is dead or Pittsburg has updated its ordinance, report it and we'll verify against the official source.

Report a correction

Ready to build?

Planning an ADU in Pittsburg?

Tell us about your project and we'll match you with vetted local designers and builders as we bring them online. No cost, no obligation.