County · California
ADU rules in Ventura County
These are the primary sources for accessory dwelling unit regulations in Ventura County: the county's own zoning code, planning department pages, and permit guides. Start here before talking to anyone: the rules below are what your permit reviewer will apply.
Unincorporated areas only
County zoning applies only outside city limits. If your property is inside a city or town, that municipality's own ADU ordinance governs instead, even though it sits within Ventura County.
Find your city's rules in CaliforniaRules at a glance
Outside the Coastal Zone, the Non-Coastal Zoning Ordinance (NCZO) allows a detached ADU with an existing or proposed single-family or multifamily home in every zone that allows housing: R1, R2, RES, RPD, R/MU, RHD, RA, RE, RO and CPD/CBD, plus the OS, AE and TP open space, agricultural and timberland zones (NCZO 8107-1.7.4, 8107-1.7.5(a)). A new detached unit of up to 850 sq ft with 4-foot side and rear setbacks needs only a building permit on a single-family lot in the residential zones (8107-1.7.4(b)); a larger detached unit, or any ADU in OS, AE or TP (one per lot there), first gets a ministerial Zoning Clearance (8107-1.7.5). On multifamily lots the codified text still says two detached ADUs (8107-1.7.4(d)), but the County's ADU page acknowledges the state count now governs: up to eight on a lot with an existing multifamily building, never more than its existing units, and two with a proposed one (Gov. Code 66323(a)(4)). In the Coastal Zone the certified Coastal Zoning Ordinance (CZO) still allows one ADU per lot with a single-family home and requires a Coastal Development Permit, issued by the Planning Director without a public hearing, for any new detached unit (CZO 8175-5.1.1, 8175-5.1.1.2), with state standards applied where applicable until the 2025 coastal update (Ord. 4654) is certified.
Ventura County Ordinance Code Div. 8, Ch. 1 (NCZO) §§ 8107-1.7.4(b), (d), 8107-1.7.5(a)-(b); Div. 8, Ch. 1.1 (CZO) §§ 8175-5.1.1, 8175-5.1.1.2; Gov. Code § 66323(a)(2), (a)(4)One ADU created inside the existing or proposed space of a house or an existing accessory structure (garage conversions included, with up to 150 sq ft added for entry and exit) needs only a building permit in the residential zones (8107-1.7.4(a)), and a new attached addition is approved by ministerial Zoning Clearance under the same lot-size caps as a detached unit (8107-1.7.3(b), 8107-1.7.5). A single-family lot in a residential zone may combine two ADUs (one conversion plus one new detached or attached unit) with one JADU; in OS, AE and TP only one ADU is allowed and no JADU, and an ADU inside the house there must have its own exterior entrance and no interior connection (8107-1.7.5(b), (h), 8107-1.7.6(a)). JADUs of up to 500 sq ft are allowed inside a single-family house, including an attached garage, in the R1, R2, RES, RA, RE and RO zones, one per lot (8107-1.7.6). In the Coastal Zone a conversion inside the existing house or an attached accessory structure is exempt from a Coastal Development Permit and gets a Zoning Clearance (CZO 8175-5.1.1.1), an attached addition needs a Coastal Development Permit, and the County states that JADUs are not allowed in coastal areas until Ord. 4654 is certified.
NCZO §§ 8107-1.7.3, 8107-1.7.4(a), 8107-1.7.5(b), (h), 8107-1.7.6(a); CZO §§ 8175-5.1.1.1, 8175-5.1.1.2; RMA Planning ADU page, 'ADUs in the Coastal Zones' (updated Feb. 26, 2026)Section 8107-1.7.5(g) caps an attached or detached ADU by lot size: on lots of 9,000 sq ft or less, 850 sq ft with one bedroom or as an efficiency unit and 1,000 sq ft with more than one bedroom; 1,200 sq ft on lots over 9,000 sq ft but under 10 acres; and 1,800 sq ft on lots of 10 acres or more, with no percent-of-house limit, and an 850 sq ft unit with 4-foot setbacks is always allowed regardless of lot coverage, floor area ratio, open space, front setback or lot size (8107-1.7.5(j)). Units approved by building permit alone follow the state pathway instead: a new detached ADU of up to 850 sq ft on a single-family lot, conversions of existing space with no cap beyond a 150 sq ft entry expansion (in OS, AE and TP a conversion is held to the lot-size caps, 8107-1.7.5(h)), and detached units on multifamily lots, which the codified text caps at 1,200 sq ft even though Gov. Code 66323(b) authorizes no size standard for them (8107-1.7.4); JADUs are capped at 500 sq ft. Detached ADUs may be 16 feet tall (18 feet within one-half mile walking distance of a major transit stop or high-quality transit corridor, plus 2 feet for a matching roof pitch, or on a lot with a multistory multifamily building), may reach the house's height limit if set back 20 feet from every property line, and never exceed two stories; attached ADUs may be 25 feet or the house's limit, whichever is lower (8107-1.7.5(d)). The NCZO measures 'total floor area' to the exterior walls (8107-1.7.2), while since January 1, 2026 the state floors of 850 and 1,000 sq ft count interior livable space (Gov. Code 66321(b)(2), SB 543), so where the state measure allows more it governs (8107-1.7.1). In the Coastal Zone the certified CZO still caps a permit-track ADU at 700 sq ft of gross floor area (8175-5.1.1.2(b)), which the County reviews against state standards until Ord. 4654 brings the coastal caps in line with the NCZO tiers in interior livable space.
NCZO §§ 8107-1.7.1, 8107-1.7.2 (Total Floor Area), 8107-1.7.4(a)-(d), 8107-1.7.5(d), (g), (j), 8107-1.7.6(b); CZO § 8175-5.1.1.2(b); Gov. Code §§ 66321(b), 66323(a)-(b)No owner occupancy is required for an ADU: Section 8107-1.7.7(e)(3)(a) says the owner of a lot with an ADU does not have to live in the house or the ADU, consistent with Gov. Code 66315. JADUs are the exception, and here the codified text lags state law: 8107-1.7.7(e)(3)(b), as amended by Ord. 4633 in 2024, still requires the owner to live in the house at application and afterward for every JADU, while AB 1154 limited the requirement, from January 1, 2026, to JADUs that share sanitation facilities with the house (Gov. Code 66333(b)), and both Gov. Code 66339.5 and the NCZO's own 8107-1.7.1 make state law govern. The County administers the state rule: its non-coastal JADU deed restriction form, revised February 26, 2026, recites an owner-occupancy requirement only if the JADU shares sanitation facilities and omits the occupancy covenant that 8107-1.7.7(f)(2)(d) still lists, and the August 2026 draft ADU Guidebook says the same, although the ADU web page still prints the universal rule. In the Coastal Zone the certified CZO 8175-5.1.1.2(n) still requires the owner to live in the house or the ADU at application for a permit-track ADU, but the County's Coastal Zone ADU Affidavit asks only for the over-30-day rental and no-separate-sale commitments, and pending Ord. 4654 would drop owner occupancy for coastal ADUs and JADUs entirely.
NCZO §§ 8107-1.7.1, 8107-1.7.7(e)(3), (f)(2)(d); CZO § 8175-5.1.1.2(n); RMA Non-Coastal JADU Deed Restriction (rev. Feb. 26, 2026); Coastal Zone ADU Affidavit; Gov. Code §§ 66315, 66333(b), 66339.5ADUs approved by building permit alone under 8107-1.7.4 (conversions of existing space, a detached unit of up to 850 sq ft on a single-family lot, and the multifamily-lot units) are exempt from the parking standards (8107-1.7.4(f); parking table 8108-4), and JADUs need none (8107-1.7.6(e)). A larger or attached ADU approved by Zoning Clearance needs one covered or uncovered space per ADU or per bedroom, whichever is less, which may be tandem on a driveway or in a front or interior side setback, unless the unit is within one-half mile walking distance of public transit, in a historic district, part of the house or an accessory structure, where on-street permits are required but not offered to its occupant, within one block of a car-share vehicle, or applied for with a new home and meeting one of those tests (8107-1.7.5(c)); the County's draft Guidebook also treats a studio as needing no space. A garage, carport or covered space converted or demolished for an ADU need not be replaced (8107-1.7.5(c)(3)); a leftover 2018 footnote in the parking table still speaks of replacement parking but yields to that section and Gov. Code 66314(d)(11). In the Coastal Zone the certified CZO requires one space for a permit-track ADU with similar exemptions, still provides for replacement parking when a garage is demolished (in any configuration), and bars setback or tandem ADU parking in the North Coast and Santa Monica Mountains fire areas unless the Fire Marshal clears access (8175-5.1.1.2(e)-(h), 8176-3.7), subject to the state limits the County applies where applicable.
NCZO §§ 8107-1.7.4(f), 8107-1.7.5(c), 8107-1.7.6(e), 8108-4 (parking table and note 2); CZO §§ 8175-5.1.1.1(b)-(c), 8175-5.1.1.2(e)-(h), 8176-3.7; Gov. Code §§ 66314(d)(10)-(11), 66322(a)Review is ministerial: ADU and JADU applications that meet 8107-1.7 'shall be considered and approved ministerially without discretionary review or a hearing' (8107-1.7.7(a)); units meeting the state-style standards of 8107-1.7.4 and all JADUs are approved directly with a building permit, and all other ADUs with a ministerial Zoning Clearance from the Planning Director before the building permit (8107-1.7.7(b)), with no variances except cultural-heritage deviations and reasonable accommodations. Applicants also file an Estimated Rental Amount form for the County's Housing Element monitoring (Program HE-Z). The NCZO still calls ADU decisions final and not appealable (8111-7.2(a), 8111-7.6(b)), but since January 1, 2026 Gov. Code 66317(d) requires an appeal to the Board of Supervisors or Planning Commission for incompleteness determinations and denials, decided within 60 business days. In the Coastal Zone a conversion inside existing space gets a Coastal Development Permit exemption and a Zoning Clearance, while other ADUs need a Coastal Development Permit in the form of a Planning Director-approved Planned Development Permit, decided after public notice and written comments but without a public hearing (CZO 8175-5.1.1.2, 8181-13); since AB 462 (effective October 10, 2025) those decisions must come within 60 days and are no longer appealable to the Coastal Commission (Gov. Code 66329).
NCZO §§ 8107-1.7.7(a)-(b), 8111-7.2(a), 8111-7.6; CZO §§ 8174-5 (use table), 8175-5.1.1.1, 8175-5.1.1.2, 8181-13; Gov. Code §§ 66317, 66329An ADU and a JADU may each be rented separately from the house, but every rental must be for a term longer than 30 consecutive days (8107-1.7.7(e)(1)-(2)), and the codified text requires a recorded deed restriction saying so for each ADU (8107-1.7.7(f)(1)); state law independently requires the over-30-day term for state-pathway ADUs and for JADUs (Gov. Code 66323(e), 66333(g)). The County's short-term rental rules also exclude ADUs outright: no homeshare or short-term rental permit may issue for 'a dwelling that was permitted as a second dwelling unit or an accessory dwelling unit', both in the Ojai Valley Temporary Rental Unit (TRU) overlay, where short-term rentals are barred except on 2018 landmark properties and owner-present homeshares need an annual Zoning Clearance (NCZO 8109-4.6), and in the Coastal Zone, where short-term rentals and homeshares otherwise need an annual permit, a business license and transient occupancy tax (CZO 8175-5.21); the certified CZO separately bars transient occupancy of ADUs (8175-5.1.1.2(m)). An ADU cannot be sold or conveyed separately from the house except as Gov. Code 66340 et seq. allows, which the County's draft FAQ reads as the 66341 qualified-nonprofit sale; no Gov. Code 66342 ADU-condominium ordinance appears in the NCZO, the pending coastal ordinance or the Board record, and a JADU can never be sold separately (8107-1.7.7(e)(4)).
NCZO §§ 8107-1.7.7(e)-(f), 8109-4.6.1, 8109-4.6.5.2(a); CZO §§ 8175-5.1.1.2(m), 8175-5.21.1, 8175-5.21.5.2(a); Gov. Code §§ 66315, 66323(e), 66333(g), 66341The fine print: 10 caveats that can change the picture
- Scope: the unincorporated area of Ventura County only, administered by the Resource Management Agency (RMA) Planning Division. The ten cities (Camarillo, Fillmore, Moorpark, Ojai, Oxnard, Port Hueneme, San Buenaventura (Ventura), Santa Paula, Simi Valley and Thousand Oaks) set their own ADU rules; Ojai, Oxnard, Ventura, Simi Valley and Thousand Oaks have their own directory entries.
- Two zoning codes: the Non-Coastal Zoning Ordinance governs everywhere outside the Coastal Zone and supplies the table values. The Coastal Zone (Hollywood Beach, Silver Strand, Solimar, Faria, Rincon, Mussel Shoals, La Conchita and the Santa Monica Mountains coast around Solromar) is still governed by the certified CZO 8175-5.1.1 of 2018 (Ord. 4520): one ADU per lot with a single-family home, a 700 sq ft gross cap, a lot-size minimum, owner residence at application, a Coastal Development Permit without hearing except for conversions of existing space, and no transient rental. The County's ADU page says coastal applications are reviewed under 8175-5.1.1 'and where applicable, the State's revised development standards', and that JADUs are not allowed in coastal areas until the update is certified; confirm coastal size, parking and owner-occupancy treatment with the Planning Division.
- Pending coastal update: Ord. 4654 (PL25-0037; Planning Commission 4-0 on 9-18-2025, adopted by the Board 5-0 on 11-18-2025) repeals 8175-5.1.1 and adds CZO 8175-5.24 mirroring the NCZO (JADUs allowed, 850/1,000, 1,200 and 1,800 sq ft tiers in interior livable space, a Coastal Development Permit for every detached unit and for units in the 8174-6.2.2(c) sensitive locations, a Zoning Clearance otherwise for conversions and attached additions to existing homes, no owner occupancy for ADUs or JADUs, no ADU deed restriction). It takes effect only on Coastal Commission certification: LCP Amendment LCP-4-VNT-26-0002-1 was filed 1-6-2026, the Commission extended its 60-working-day deadline (4-3-2026) by one year on 3-11-2026, the item is not on the October 7 to 9, 2026 agenda, and the County's 8-20-2026 staff report still called it pending HCD review and Coastal Commission certification. Re-check on certification or by about 4-3-2027.
- Codified NCZO text that state law overrides (8107-1.7.1 says state law governs conflicts): (1) the universal JADU owner-occupancy clause 8107-1.7.7(e)(3)(b), narrowed by Gov. Code 66333(b) to shared-sanitation JADUs; (2) the two-detached-ADU count on multifamily lots in 8107-1.7.4(d), superseded by the SB 1211 count in Gov. Code 66323(a)(4); (3) the 1,200 sq ft cap on those multifamily-lot units in 8107-1.7.4(d)(3), which Gov. Code 66323(b) does not authorize (HCD raised it in 2023); (4) size measured as total floor area to exterior walls, while the state floors count interior livable space since 1-1-2026; (5) 8111-7.2(a) and 8111-7.6(b) making ADU decisions unappealable, while Gov. Code 66317(d) now requires an appeal for incompleteness determinations and denials.
- Stale County statements: the RMA ADU page (last updated 2-26-2026) still says the JADU owner must live in the house in every case and cites Gov. Code 65852.22, although the County's own JADU deed restriction revised the same day recites the shared-sanitation rule. The ADU Guidebook, FAQ and Homeowner's ADU Checklist presented to the Planning Commission on 8-20-2026 (Final Draft, August 2026) apply the AB 1154 and SB 1211 rules and preview the pending coastal ordinance, but were not yet posted on the ADU page as of 9-29-2026, and the page still lists them as coming soon.
- Agricultural and open space land: in the AE, OS and TP zones only one ADU is allowed, always by Zoning Clearance, and JADUs are not allowed; farmworker and animal caretaker dwelling units are a separate use under NCZO 8107-41 (the County's free standardized plans cover both). Rural lots on septic or private wells need an Environmental Health onsite wastewater (OWTS) clearance and a Watershed Protection District well water approval, per the County's draft FAQ (state law allows a recent percolation test, Gov. Code 66323(f)), and the certified CZO bars coastal ADUs where adequate water and sewage disposal cannot be shown (8175-5.1.1.2(i)). In the Ojai Valley the Area Plan's building lot coverage caps (NCZO 8106-1.4.1.1.5, as low as 5 percent in OS designations) can limit a larger Zoning Clearance ADU, although building-permit ADUs are exempt from lot coverage (8107-1.7.4(f)) and an 850 sq ft unit with 4-foot setbacks is always allowed (8107-1.7.5(j)).
- Overlays and hazards: the NCZO has no ADU-specific fire-zone access rule, though ADU permits typically go through the Ventura County Fire Prevention Bureau (Form 610B per the draft FAQ), the draft Guidebook flags Fire Hazard Severity Zones and wildland-urban interface lots for added review, and the certified CZO limits ADU parking location in the North Coast and Santa Monica Mountains fire areas (8175-5.1.1.2(h)). Scenic Resource Protection, Habitat Connectivity and Wildlife Corridor, ESHA, flood, tree protection and historic district overlays can add review, but ADUs still get no public hearing.
- Short-term rentals: in the Ojai Valley TRU overlay (NCZO 8109-4.6, effective 7-19-2018) short-term rentals are barred except on landmarks designated by 6-19-2018 and owner-present homeshares need an annual Zoning Clearance; elsewhere outside the Coastal Zone the NCZO use matrix lists short-term rentals and homeshares as exempt, which the pending NCZO Reform Year 1 package (PL25-0013, on the Planning Commission's 9-17-2026 agenda, Board hearing tentatively 12-15-2026) would state expressly; the Coastal Zone requires an annual TRU permit (CZO 8175-5.21, effective 11-1-2018). None of this helps an ADU or JADU, which must rent for more than 30 days and cannot hold a TRU permit.
- Separate sale: only the Gov. Code 66341 qualified-nonprofit conveyance; the County has not opted into the Gov. Code 66342 ADU-condominium regime.
- 2026 state law: SB 1117 (Chapter 809, Statutes of 2026) and AB 956 (Chapter 791, Statutes of 2026) were signed on September 29, 2026 and take effect January 1, 2027. From that date AB 956 amends Gov. Code 66323 so the state-exempt pathway allows two detached new-construction ADUs on a single-family lot, with no JADU owed where two exist, and extends the Civ. Code 714.3 and 4751 CC&R anti-restriction rule to any lot zoned to allow single-family use; SB 1117 amends Gov. Code 66311.5 so impact fees on an ADU over 750 sq ft are charged only on the area above 750 sq ft. From January 1, 2027 the County's one-detached-unit limit on single-family lots in 8107-1.7.4(b) yields to the two-unit exempt count; until then the current text governs.
Summarized from Ventura County's ordinance text, read September 2026; every row links the code section it came from. Rules often vary by zone and lot, so treat this as orientation, not a permit determination, and confirm with the planning department before you commit to a design.
ADU regulations
- rma.venturacounty.govOfficial sourceVerified September 2026https://rma.venturacounty.gov/divisions/planning/accessory-dwelling-units/
- library.municode.comOfficial sourceLive September 2026Code of Ordinances §8107-1.7https://library.municode.com/ca/ventura_county/codes/code_of_ordinances?nodeId=DIV8PLDE_CH1ZO_ART7STSPUS_8107-1.7ACDWUNJUACDWUN
- rma.venturacounty.govOfficial sourceVerified September 2026https://rma.venturacounty.gov/divisions/planning/accessory-dwelling-farmworker-dwelling/
Short-term rental rules
Planning to rent your ADU on Airbnb or VRBO? Ventura County regulates short-term rentals separately; check these before counting on nightly rental income.
California statewide law also applies
California sets baseline ADU rights at the state level. Where local rules are stricter than state law allows, state law usually wins, so both are worth reading.
See California statewide rulesSpotted something outdated?
Zoning codes change. If a link is dead or Ventura County has updated its ordinance, report it and we'll verify against the official source.
Report a correctionReady to build?
Planning an ADU in Ventura County?
Tell us about your project and we'll match you with vetted local designers and builders as we bring them online. No cost, no obligation.