City · California
ADU rules in Westminster
These are the primary sources for accessory dwelling unit regulations in Westminster: the city's own zoning code, planning department pages, and permit guides. Start here before talking to anyone: the rules below are what your permit reviewer will apply.
Rules at a glance
Detached ADUs are allowed with an existing or proposed single-family or multifamily home in every zone that allows residential development: the residential use table lists 'Accessory dwelling units and junior accessory dwelling units' as permitted (P) in R1 through R5 (WMC 17.210.010, Table 2-2), the mixed-use (MU) zone table, as amended by Ord. No. 2634 (adopted May 13, 2026), lists them as P, and 17.400.135.C.1 extends this to specific plan and mixed-use zones on lots with a residence. A new detached ADU needs 4-foot side and rear setbacks plus the zone's front setback, 6 feet of separation from the house and other detached accessory structures on a single-family lot (10 feet from other dwellings on a multifamily lot), siding and roof that match the main home, shielded lighting and no encroachment into easements (17.400.135.L.5, L.6, L.9). The codified count rule still reads 'only one ADU or JADU' on a single-family lot except under the state-exempt pathway (C.3.a), which itself allows a detached new-construction unit of up to 800 sq ft with 4-foot setbacks combined with a JADU (N.1.b); Gov. Code 66323(a), as amended by SB 543 effective January 1, 2026, requires approval of 'any combination' of the exempt units, and the clerk's video index of the August 26, 2026 City Council meeting records the Community Development Director saying the city follows state law, with a limit of two ADUs and one JADU. On a lot with an existing multifamily building up to eight detached ADUs are allowed, never more than the number of existing units, and two with a proposed multifamily building (N.1.d-e).
WMC §§ 17.400.135.C.1, C.3, C.4, L.5, L.6, N.1.b, N.1.d-e (Ord. No. 2628); WMC § 17.210.010 Table 2-2; WMC § 17.260.010 (Ord. No. 2634); Gov. Code § 66323(a)Attached ADUs (additions physically attached to the home) and converted ADUs (all or part of the existing interior space of a dwelling or accessory structure, including attached or detached garages) are allowed on the same residential lots (17.400.135.B.2-B.4, C.4). Converted space needs no new setbacks (L.5.a), and under the state-exempt pathway one ADU and one JADU may be created within the existing or proposed space of a single-unit dwelling or accessory structure, with an accessory structure allowed to grow by up to 150 sq ft for ingress and egress (N.1.a). An attached ADU may be up to 25 feet or the zone's height limit, whichever is lower, and no more than two stories (L.1.a.iv); an ADU inside the second floor of a home may not have exterior stairs (L.7.a). A JADU of up to 500 sq ft may be created within a single-unit dwelling, including an attached garage, on a lot zoned for single-family use, with an efficiency kitchen and a separate entrance on a different side of the home than its front door (C.2, M.1-M.3, M.8.b); the single-family-zone limit follows HCD's December 18, 2023 letter to the city. In existing multifamily buildings, ADUs may be converted from non-livable space such as storage rooms, attics, basements or garages: at least one, and up to 25 percent of the existing units (N.1.c).
WMC §§ 17.400.135.B.2-B.4, C.2, C.4, L.1.a.iv, L.5.a, L.7.a, M.1-M.3, M.8.b, N.1.a, N.1.c; Gov. Code §§ 66323(a)(1), (a)(3), 66333; HCD technical assistance letter to Westminster, Dec. 18, 2023A detached ADU may have up to 1,200 sq ft of floor area (17.400.135.L.4.b). An attached ADU is capped at 1,200 sq ft or 50 percent of the living area of the primary dwelling, whichever is less, but 850 sq ft is always allowed for a studio or one-bedroom unit and 1,000 sq ft for a unit with more than one bedroom (L.4.a). An ADU converted entirely within an existing structure has no size cap, and when a larger new home is built the whole existing house may be converted to an ADU (L.4.c-d); the state-exempt detached unit is capped at 800 sq ft and a JADU at 500 sq ft (N.1.b, M.8.b). Heights: 16 feet for a detached ADU, 18 feet within one-half mile walking distance of a major transit stop or high-quality transit corridor (plus 2 feet to match the home's roof pitch) or on a lot with a multistory multifamily building, and 25 feet or the zone limit, whichever is lower, for an attached ADU, two stories maximum (L.1.a). Since Ord. No. 2628 every ADU counts toward the zone's lot coverage (40 percent in R1, WMC 17.210.015 Table 2-3), and zone standards are waived only as far as needed for an 800 sq ft ADU (L.2, L.12), so on small lots coverage can hold a non-exempt ADU near 800 sq ft. The Council kept the 1,200 sq ft cap in November 2025 although the September 24, 2025 staff report offered a 1,000 sq ft option for units with more than one bedroom. 'Floor area' means gross floor area measured from the interior face of exterior walls and counting partitions, stairways and mechanical rooms (17.700.010), while Gov. Code 66321(b) measures the state size floors in interior livable space; the city's pre-approved plans are sized by net interior area (748 to 1,198 sq ft).
WMC §§ 17.400.135.L.1.a, L.2, L.4.a-d, L.12, M.8.b, N.1.b; WMC § 17.210.015 Table 2-3; WMC § 17.700.010 ('Floor area', 'Gross floor area'); Gov. Code §§ 66314(d)(4)-(5), 66321(b)(2)-(4), 66323(a)(2)Section 17.400.135 imposes no owner-occupancy requirement on ADUs, and Gov. Code 66315 bars one ('No additional standards ... shall be used or imposed, including an owner-occupant requirement'). JADUs differ on paper: the codified deed restriction still requires, for every new JADU, that 'the owner must reside either in the primary dwelling or in the JADU' unless the owner is a government agency, land trust or housing organization (M.8.d), and the June 2025 application packet (PL-117) repeats that rule. Ord. No. 2628 was adopted November 12, 2025, before AB 1154 took effect on January 1, 2026; Gov. Code 66333(b) now allows owner occupancy to be required only when the JADU shares sanitation facilities with the main home, and 17.400.135.A.2 makes mandatory state law control over conflicting local text. So a JADU with its own bathroom carries no owner-occupancy condition, while one that shares a bathroom still does; the pending Zoning Code rewrite (Case No. 2026-0053) would codify the shared-sanitation rule.
WMC §§ 17.400.135.A.2, M.8.d (Ord. No. 2628); Gov. Code §§ 66315, 66333(b) (AB 1154, eff. Jan. 1, 2026); City of Westminster ADU application packet PL-117 (June 2025), note 8One off-street space is required for an ADU in addition to the home's own parking, unless the ADU has no bedroom (a studio), and it may be provided as tandem parking on a driveway (17.400.135.L.11.a); the citywide parking table simply refers ADUs to this section (WMC 17.320.020). No space is required when the ADU is within one-half mile walking distance of public transit such as a bus stop, within an architecturally and historically significant district, part of the proposed or existing home or an accessory structure, where on-street permits are required but not offered to the occupant, within one block of a car-share vehicle, or applied for together with a new home that meets one of those tests (L.11.b, mirroring Gov. Code 66322(a)). Garages, carports and covered or uncovered spaces demolished or converted for an ADU need not be replaced (L.11.c), JADUs need no parking (M.5), and units on the state-exempt pathway are free of the section's other objective standards, parking included (N.1). Lots with an ADU or JADU may widen the driveway by 5 feet (WMC 17.300.020.D.2).
WMC §§ 17.400.135.L.11, M.5, N.1; WMC §§ 17.320.020, 17.300.020.D.2; Gov. Code §§ 66314(d)(10)-(11), 66322(a), 66323(b)ADUs and JADUs are approved ministerially: a complete application must be approved or denied within 60 days, or 30 days for a city pre-approved plan or a plan identical to a detached ADU approved in the current building-code cycle, and it is deemed approved if the city does not act (17.400.135.D.1, D.1.e-f); state-exempt units must be approved ministerially on a building permit (N.1). The city runs a combined Planning zoning clearance and Building plan check, filed with the Building Division in person or through the Westminster Build online portal (application packet PL-117), and ADUs and JADUs are exempt from Development Review (WMC 17.520.010.C.1). Gov. Code 66317 adds the 15-business-day completeness determination, which the local text does not yet carry. The city offers free pre-approved detached ADU plans in six layouts from 748 to 1,198 sq ft (net interior area); they are not pre-permitted and may not be used in a flood zone or for projects that also include a JADU, a room addition, corrections of unpermitted work or a new garage.
WMC §§ 17.400.135.D.1, N.1 (Ord. No. 2628); WMC § 17.520.010.C.1; Gov. Code § 66317; City ADU application packet PL-117 (June 2025); ADU Standard Plan Guide (June 2025)The ADU section says ADUs and JADUs 'may not be rented for periods of less than 30 days' (17.400.135.I, with the same rule for state-exempt units in N.3 and in the JADU deed restriction, M.8.c), but Westminster's citywide short-term rental ban (Chapter 9.74, Ord. No. 2566 of 2020) makes it unlawful to rent or advertise any residential dwelling, dwelling unit or room for 'transient use', defined as rental 'for a period of thirty days or less' (9.74.010, 9.74.020; zoning cross-reference 17.200.020.G), so in practice an ADU or JADU must be rented for 31 days or more; hosting platforms may not complete booking transactions for residential property (9.74.030), and the city's ADU application packet says the same ('30 days or less'). State law requires terms longer than 30 days for JADUs and state-exempt 66323 units anyway (Gov. Code 66333(g), 66323(e)); for an ordinary ADU, Gov. Code 66315 lets a city require terms of 30 days or longer, so the citywide ban sits one day past that floor. An ADU may not be sold or conveyed separately from the main home except through a qualified nonprofit under Gov. Code 66341 (17.400.135.H); Westminster has not opted into the Gov. Code 66342 ADU-condominium regime. The code has no rental registration or rent stabilization program.
WMC §§ 9.74.010-9.74.040 (Ord. No. 2566); WMC §§ 17.400.135.H, I, M.8.c, N.3; WMC § 17.200.020.G; Gov. Code §§ 66315, 66323(e), 66333(g), 66341, 66342The fine print: 11 caveats that can change the picture
- Pending rewrite: the Comprehensive Zoning Code Update (Case No. 2026-0053, GPA and ZTA) would repeal and replace all of Title 17 and renumber the ADU rules as § 17.210.080. Its Planning Commission hearing is set for October 21, 2026 and a City Council hearing is tentatively set for November 18, 2026; the draft (clean and redlined copies revised October 6, 2026, westminster-ca.gov documents 11370 and 11372) keeps the 1,200 sq ft and 850/1,000 sq ft caps and the one-space parking rule but would allow one ADU and one JADU, approve 'any combination' of state-exempt units including two detached new-construction units, require owner occupancy only for a JADU that shares sanitation, set a 31-day minimum rental for all ADUs and JADUs, measure all sizes in interior livable space, charge impact fees only on the area above 750 sq ft where a lot has up to two ADUs, and add a 15-business-day completeness check and appeals. Re-check after Council action (by about 2027-01-15).
- Chaptered 2026 state law effective January 1, 2027: AB 956 (Ch. 791, Stats. 2026) amends Gov. Code 66323 to allow two detached new-construction ADUs on a single-family lot (with no JADU owed where two exist), so the codified one-unit rule in 17.400.135.N.1.b yields from that date; SB 1117 (Ch. 809, Stats. 2026) amends Gov. Code 66311.5 so impact fees on an ADU over 750 sq ft attach only to the area above 750 sq ft, overriding the whole-unit proportional formula in 17.400.135.F.2.b.
- Codified text that state law overrides: the 'only one ADU or JADU' count on single-family lots (17.400.135.C.3.a) yields to Gov. Code 66323(a) 'any combination', and the Community Development Director told the Council on August 26, 2026 (clerk's video index) that the city follows state law, two ADUs and one JADU; the universal JADU owner-occupancy deed restriction (M.8.d) yields to 66333(b); the 'less than 30 days' floor for JADUs and state-exempt units (M.8.c, N.3) falls one day short of 66333(g) and 66323(e), though the citywide Chapter 9.74 ban already requires 31 days; the impact-fee exemption covers only ADUs 'less than 750 square feet' (F.2.a) against 750 sq ft or less of interior livable space in Gov. Code 66311.5(c)(1); and the rule that an ADU containing a second floor must meet single-family setbacks (L.5.e) can exceed the 4-foot side and rear setback cap of 66314(d)(7) if applied to a new ADU. Section 17.400.135.A.2 says mandatory state law controls.
- HCD status: HCD's March 3, 2023 findings on the 2021 Ord. No. 2572 (zones, unit combinations, heights, JADU zones) drew a city response on March 31, 2023 and a follow-up technical assistance letter on December 18, 2023 (JADUs only in single-family zones; a converted ADU, a detached ADU and a JADU must be allowed together); Ord. No. 2628 (adopted November 12, 2025) was the city's answer. HCD's index (current to July 14, 2026) and its letters dashboard (rows through September 23, 2026) show no letter on Ord. No. 2628 and no public record shows it was submitted within 60 days under Gov. Code 66326(a). A Gov. Code 66326(d) void reading would substitute the state standards, which the headline values already track; mainly the ADU-specific local design and second-story rules would drop.
- Measurement: the ADU caps are stated in 'floor area', which WMC 17.700.010 defines as gross floor area from the interior face of exterior walls including partitions, stairways and mechanical rooms, while Gov. Code 66321(b) (as amended by SB 543) measures the 850, 1,000 and 800 sq ft guarantees in interior livable space; the city's pre-approved plans are labeled by net interior area, and the pending rewrite would measure everything in interior livable space.
- Lot coverage: since Ord. No. 2628 every ADU counts toward the zone's lot coverage (40 percent in R1, 50 percent in R4, 60 percent in R5) and the underlying zone standards are waived only as far as needed for an 800 sq ft ADU (17.400.135.L.2, L.12), so above 800 sq ft a non-exempt ADU can be limited by coverage on small lots; state-exempt units under 17.400.135.N carry no other objective standards.
- Stale city materials: the city ADU page (kept as a directory link) still lists 'ADU Permanent Ordinance No. 2572' (the repealed 2021 text), the October 2021 ADU Guide, the August 2021 workshop slides, the July 2021 FAQ and the September 2021 development standards tables (16-foot height cap, one ADU plus one JADU, universal JADU owner occupancy, 1,000 sq ft rear open space), its 'Development Standards' links point to the defunct qcode.us, and it says Development Review applies to projects of four or more new units while WMC 17.520.010.A.2 now says three. The June 2025 application packet PL-117 predates Ord. No. 2628, prints universal JADU owner occupancy and requires a separate water meter for every ADU, which Gov. Code 66311.5(d) bars for converted units under 66323(a)(1).
- Water and sewer: 17.400.135.G bars new non-exempt ADUs in areas the City Engineer maps as having insufficient water or sewer service, but no such map is posted on the city's ADU pages and none was found.
- SB 9 lots: on a parcel created by an urban lot split, WMC 16.12.080.D caps each parcel at two units counting ADUs and JADUs; on an unsplit R1 lot with an SB 9 two-unit development, ADUs and JADUs are allowed under 17.400.135 (17.400.122.C.1).
- Flood zones: properties in a FEMA Special Flood Hazard Area face the city's flood requirements and cannot use the pre-approved standard plans. The municipal code has no coastal-zone provisions (a quoted eCode360 search for 'coastal zone' returns nothing).
- Drafting artifacts in Ord. No. 2628: 17.400.135.L.10 cross-references subsections B.3 and B.4, which are definitions (leftovers from the 2021 numbering); E.5 and F.2.d cite Gov. Code 66324, renumbered 66311.5 by SB 543; and the 17.700.010 definition of an accessory dwelling unit still points to the legacy Gov. Code 65852.2.
Summarized from Westminster's ordinance text, read October 2026; every row links the code section it came from. Rules often vary by zone and lot, so treat this as orientation, not a permit determination, and confirm with the planning department before you commit to a design.
ADU regulations
- ecode360.comOfficial sourceVerified October 2026https://ecode360.com/43536196
- westminster-ca.govOfficial sourceVerified October 2026https://www.westminster-ca.gov/departments/community-development/planning-division/accessory-dwelling-units
- westminster-ca.govOfficial sourceVerified October 2026https://www.westminster-ca.gov/departments/community-development/planning-division/accessory-dwelling-unit-standard-plan
Short-term rental rules
Planning to rent your ADU on Airbnb or VRBO? Westminster regulates short-term rentals separately; check these before counting on nightly rental income.
California statewide law also applies
California sets baseline ADU rights at the state level. Where local rules are stricter than state law allows, state law usually wins, so both are worth reading.
See California statewide rulesSpotted something outdated?
Zoning codes change. If a link is dead or Westminster has updated its ordinance, report it and we'll verify against the official source.
Report a correctionReady to build?
Planning an ADU in Westminster?
Tell us about your project and we'll match you with vetted local designers and builders as we bring them online. No cost, no obligation.